Trimline Shelving Assembly Instructions | |
 | - Average build time 10 - 15 mins per bay
- Tools required:
Rubber mallet for assembly, screwdriver to lock safety tabs. - Bays with a height to depth ratio exceeding 5:1 should be floor or wall fixed.
Trimline Assembly Instructions |  |
|
Type 1 Heavy Duty Shelving Instructions | |
 | - Average build time 10 - 15mins per bay
- Tools required:
Rubber mallet for assembly, screwdriver to lock safety tabs. - Bays with a height to depth ratio exceeding 5:1 should be floor or wall fixed.
Type 1 Assembly Instructions |  Video Available |
|
Longspan Racking Instructions | |
 | - Average build time 10 - 15 mins per bay.
- Tools required:
Rubber mallet for inserting beams, 2 x 13mm spanners for securing frame braces. - Bays with a height to depth ratio exceeding 5:1 should be floor or wall fixed.
Longspan Assembly Instructions |  |
|
Chrome Wire Shelving Instructions | |
 | - Average build time 5-10 mins per bay.
- Tools required:
Rubber mallet for tapping in corners. Chrome Shelving Assembly Instructions |  |
|
Trimline Pigeon Hole Assembly Instructions | |
 | - Average build time 15-20 mins per bay.
- Tools required:
Rubber mallet for assembly, screwdriver to lock safety tabs. Pigeon Hole Assembly Instructions |  |
|
Delta Office Shelving Assembly Instructions | |
 | - Average build time 20 mins per bay.
- Tools required:
Spanners for bolting on back sheets. Delta Shelving Assembly Instructions |  |
|
EZR Heavy Duty Workstation Assembly Instructions | |
 | - Average build time 15-20 mins
- Tools required:
Rubber mallet for assembly, screwdriver to lock safety tabs. HD Workstation Assembly Instructions |  |
|
EZR Document Box Folding Instructions | |
 | - Average build time: 45 seconds
- No tools required
Archive Box Assembly Instructions |  |
|
Lever Arch File Box Assembly Instructions | |
 | - Average build time: 2 Minutes
- No tools required
Lever Arch Box Assembly Instructions |  |
|
Lateral File Shelving Assembly Instructions | |
 | - Average build time: 10-15 Minutes per bay
- Tools required:
Mallet, flat bladed screwdriver, drill & 13mm spanner Lateral Filing Bay Assembly Instructions |  |
|
EkoFit Cold Store Shelving Assembly Instructions | |
 | - Average build time: 10 Minutes per bay
- Tools required:
Mallet EkoFit Assembly Instructions |  |
|